久久国产久_baoyu133. con永久免费视频_中文字幕一区在线观看_视频一区 中文字幕_www日韩_亚洲综合国产

Welcome to Changxing Baodi Environmental Protection Technology Co., Ltd!

中文版 | English
 
Your current position: Home >> Sheet metal atomic grey_ What is sheet metal grey?

Sheet metal atomic grey_ What is sheet metal grey?


 Sheet metal ash (poly putty base), commonly known as putty; also known as unsaturated polyester resin putty. It is a kind of inlay material with rapid development in the world in recent 20 years, which makes the once backward automobile sheet metal repair industry realize a leap of the times. Bh-777 atomic ash, bh-778 atomic ash, bd-777 atomic ash, bd-778 atomic ash and bd-799 atomic ash are refined from unsaturated polyester resin (main raw materials), various fillers and auxiliaries. They are mixed with hardener in a certain proportion. They have the advantages of easy scratch coating, quick drying at room temperature, easy grinding, strong adhesion, high temperature resistance and good matching. They are ideal for surface filling of various substrates Material Science. Sheet metal ash is a kind of convenient and quick two-component new inlay repair material, which is made up of modified resin, pigment, filler, anti settling agent, cobalt salt initiator polymerization inhibitor and curing agent (peroxide) according to the weight ratio of 100:1.5-3. (sheet metal grey is the upgraded version of atomic grey, please pay attention to the screening when purchasing).

 
 
 
Sheet metal grey - Atomic grey
 
 
 
How to use sheet metal ash
 
1. The surface to be scratched must be cleaned of oil, rust, old paint film and moisture, which shall be confirmed to be dry and polished.
 
 
 
2。 The main ash and curing agent should be evenly distributed (100:1.5) to 3 (weight) and the gel time will be used in gel time (the average time of gelation of solar term ash is 5 minutes to 15 minutes). The lower the temperature, the more the curing agent will be used. But generally it should not be greater than 100:3. Sheet metal grey.
 
 
 
3. Use a scraper to scrape the adjusted sheet metal dust on the polished two-component primer or the prepared sheet metal surface. If thick layer is required to be scraped, Z shall be scraped to the required thickness several times. In case of air bubble penetration during coating, it must be completely scraped with a scraper to ensure good adhesion. Generally, 0.5-1 hour after dust scraping is the best wet grinding time for Z (for water grinding and polishing, paint can only be painted after water vapor is completely dry). 2-3 hours is the best dry grinding time. After grinding, remove the dust on the surface, and then spray the intermediate paint, finish paint, varnish and other subsequent operations. For the occasion with high requirements, after the polishing of the sheet metal ash, it is necessary to scrape and apply the fine scraping sheet metal ash (red ash and eye filling ash) to fill up the small defects, then spray the display layer and polish to check the small defects, and then carry out subsequent spraying.


PrevSome misunderstandings in the use of atomic ash
NextSome notes on the use of atomic ash

Copyright © 2020 Changxing Baodi Environmental Protection Technology Co., Ltd all reserved Web Admin --> >>

浙公網安備 33052202000243號?浙ICP備17019658號

主站蜘蛛池模板: 91亚洲 欧美 国产 制服 动漫 | 欧美激情亚洲激情 | 国产精品亚洲一区二区三区久久 | 全免费a级毛片免费毛视频 热re91久久精品国产91热 | 香蕉视频免费在线看 | 中文字幕第四页 | 久久国产免费一区 | 日韩精品网址 | 精品国产成人综合久久小说 | 亚洲图欧美 | 欧美 日韩 国产 在线 | 国产99视频精品免费观看7 | 精品一区二区三区在线成人 | 国产精品久久久精品三级 | 亚洲欧美日韩专区 | 亚洲一区二区三区高清 | 欧美国产第一页 | 亚洲第一视频网站 | 国产高清一区二区 | 国产伦精品一区二区三区免费下载 | 欧美一级高清片欧美国产欧美 | 亚洲欧美天堂网 | 国产精品欧美亚洲韩国日本不卡 | 国产成人久久精品二区三区牛 | 亚洲国产成人精彩精品 | 久久国产影院 | 永久在线观看 | 九九精品成人免费国产片 | 欧美成人伊人久久综合网 | 国产一区二区三区久久精品 | 在线精品国产一区二区 | 欧美成人精品一级高清片 | 欧美a在线观看 | 真人一级一级毛片免费观看 | 亚洲视频欧洲视频 | 亚洲欧洲日韩在线 | 日本国产最新一区二区三区 | 亚洲精品自产拍在线观看app | 天天爽夜夜爽一区二区三区 | 国产毛片久久久久久国产毛片 | 一区二区三区在线免费视频 |